| Citation(s) |
|---|
| 1993 SLG 1292 1993 SLD 1292 1993 PLC 388 |
Labour Appellate Tribunal, Sindh
Appeal No. SUK-533 of 1991, decided on 7th December, 1992.
AGHA ALI HYDER, APPELLATE TRIBUNAL
Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home/digixyei/sldsystempk.com/view/master-layout/view_case.php on line 395
Appeal No. SUK-533 of 1991, decided on 7th December, 1992.
AGHA ALI HYDER, APPELLATE TRIBUNAL
Deprecated: str_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /home/digixyei/sldsystempk.com/view/master-layout/view_case.php on line 395
EXECUTIVE ENGINEER, RIGHT BANK TUBEWELL DIVISION, RATODerE
VS
MUHAMMAD HASSAN
Law:
Section:
Industrial Relations Ordinance (XXIII of 1969)--- ----S. 38---Limitation Act (IX of 1908), S. 5---Appeal---Maintainability--Appeal against order of trial Court was filed with delay of about 11 months and alongwith appeal, application for condonation of delay was also filed---Each and every day of delay had not been explained by appellant and circumstances mentioned in application for condonation of delay, also had not made out sufficient cause to condone delay---Appeal was dismissed, in circumstances being barred by time. Abdul Sattar Khatri for Appellant. Shabbir Ahmed Awan for Respondent. Date of hearing: 7th December, 1992. DECISION The appeal was filed with the delay of about 11 months and there is an application for condonation of delay. 2. All that Mr. Abdul Sattar Khatri learned counsel for the appellant had to say, was that the Executive Engineer by the name of Mr. Jan Muhammad had entrusted the work of preferring the appeal to his Assistant Engineer by the name of…
Deprecated: trim(): Passing null to parameter #1 ($string) of type string is deprecated in /home/digixyei/sldsystempk.com/view/master-layout/view_case.php on line 492