| Citation(s) |
|---|
| 2003 SLG 3365 = 2003 SLD 3365 = 2003 PLJ 78 |
Lahore High Court
C.R.No. 1443 of 2002, decided on 20.9.2002
Presented By: SAVED ZAHID HUSSAIN, J.
Malik Noor Muhammad Awan, Advocate for Petitioner. Muhammad Ramzan Chaudhry, Advocate for
Respondent No. 1.
C.R.No. 1443 of 2002, decided on 20.9.2002
Presented By: SAVED ZAHID HUSSAIN, J.
Malik Noor Muhammad Awan, Advocate for Petitioner. Muhammad Ramzan Chaudhry, Advocate for
Respondent No. 1.
SAFDAR AHMAD-Petitioner
VERSUS
Malik AHMED KHAN and 5 others-Respondents
Law: Civil Procedure Code (V of 1908)
Section: 94
(i) Civil Procedure Code, 1908 (V of 1908)-- —-S. 94 & O. XXXIX Rr. 1, 2-Interim order passed by Appellate Court modified by High Court in terms, that petrol-pump would continue to be operated/run by plaintiff who was already in physical control of the same-Plaintiffs, however, would maintain proper accounts to be supervised and authenticated by nominee of Shell Pakistan Ltd. and would furnish security to the satisfaction of trial Court, plaintiff would furnish Bank Guarantee in the sum of specified amount before Trial Court in order to assess cost of construction, incurred in setting up petrol-pump-Trial Court would depute commission and then would direct plaintiff to furnish security for the same that would be subject to final determination as to who had incurred said cost and expenditures-Compliance of High Court order would be made within fortnight and case would be decided before commencement of winter vacation. [Pp. 80 & 81] A (ii) Civil Procedure Code, 1908 (V of 1908)— —Ss. 94 & US-Respective pleas of parties-High Court clarified that any view expressed as observation made in any of order would be construed as of tentative nature concerning within an interim interlocutory matter only-Trial Court would be absolutely un-influenced by same in deciding suit on its merits. [P. 81] B 1980 SCMR 588; 1983 SCMR 238 nf. Date of hearing: 20.9.2002. order A declaratory suit with injunction as a consequential relief instituted by Malik Ahmed Khan Respondent No. 1 is pending before the trial Court. He had also made application for the grant of temporary injunction that the petrol-pump may not be shifted to some other place. While that application was pending another application was brought by him that the supply to the petrol-pump should not be discontinued. In the suit the petitioner was arrayed as Defendant No. 1 whereas Shell Pakistan Limited and its functionaries as Defendants Nos. 2 to 5. In his reply submitted by the petitioner, to the first application, the position taken by him was that there was" no intention of shifting of the petrol-pump from the site. However,…